{"id":2017,"date":"2025-01-17T12:58:49","date_gmt":"2025-01-17T12:58:49","guid":{"rendered":"https:\/\/lynchbrotherhomes.co.uk\/?p=2017"},"modified":"2026-09-21T10:29:14","modified_gmt":"2026-09-21T10:29:14","slug":"what-are-preliminaries","status":"publish","type":"post","link":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/","title":{"rendered":"What Are Preliminaries?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\"><!-- --><\/span><\/p>\n<p><!-- ========== H1 + SNIPPET-TARGETED DEFINITION ========== --><br \/>\n<!-- NOTE: The opening paragraph is engineered to win the featured snippet for \"what are preliminaries\" \/ \"preliminaries meaning\" \/ \"preliminaries in construction\". Keep as a regular paragraph \u2014 NOT a callout box. Featured snippets pull more reliably from standard tags than from styled callouts. --><\/p>\n<h2>What Are Preliminaries in Construction? Costs &amp; Examples (UK Guide)<\/h2>\n<p><strong>Preliminaries are the indirect costs in a UK construction project \u2014 site setup, health and safety, project management, insurance, welfare facilities and temporary utilities \u2014 that enable the work to happen but aren&#8217;t part of the building itself.<\/strong> They typically account for 5\u201315% of total project cost, depending on site complexity, project size and duration.<\/p>\n<p>This guide explains what&#8217;s included in preliminaries, how much they cost, and how to manage them properly so they don&#8217;t catch you out mid-project.<\/p>\n<p class=\"byline\">By <a href=\"\/henry-lynch-bio\/\">Henry Lynch<\/a>, Managing Director, Lynch Brother Homes \u00a0\u00b7\u00a0 Updated April 2026<\/p>\n<hr \/>\n<p><!-- ========== SECTION 1: WHAT'S INCLUDED ========== --><\/p>\n<h2>What&#8217;s included in preliminaries?<\/h2>\n<p>The specifics vary by project, but most UK building contracts include the following categories under preliminaries.<\/p>\n<h3>Site setup<\/h3>\n<p>Clearing the site, establishing access routes, parking arrangements, and fencing or hoarding to secure the site against trespassers and theft. On busy or public-facing sites this can also include CCTV, lighting and gated access.<\/p>\n<h3>Health and safety<\/h3>\n<p>Personal protective equipment, hazard signage, first-aid provision, and welfare facilities (toilets, washing stations, rest areas). Compliance with Health and Safety Executive (HSE) requirements is mandatory on UK sites \u2014 particularly larger or public-facing projects under the <a href=\"https:\/\/www.hse.gov.uk\/construction\/cdm\/2015\/index.htm\" target=\"_blank\" rel=\"noopener\">CDM Regulations 2015<\/a>.<\/p>\n<h3>Project management and administration<\/h3>\n<p>Contract drafting and administration, programme scheduling, coordination of subcontractors and suppliers, and progress meetings with the client and design team. This is the layer that keeps everything moving \u2014 covered in more depth in our guide to <a href=\"\/what-is-a-building-contractor\/\">what a building contractor does<\/a>.<\/p>\n<h3>Permits, licences and surveys<\/h3>\n<p>Planning permission applications, Building Regulations submissions and inspections, structural surveys, environmental surveys, party wall agreements, and any local council permits required (for example, partial road closures for deliveries).<\/p>\n<h3>Temporary utilities<\/h3>\n<p>Power supply (mains connection or generator), water supply for drinking and trades, and sanitary facilities. On longer projects these can run for many months and add up substantially.<\/p>\n<h3>Insurance<\/h3>\n<p>Public liability insurance (typically \u00a32\u20135 million), employer&#8217;s liability insurance, contract works insurance covering materials and partial structures during the build, and professional indemnity cover for any design responsibility carried by the contractor.<\/p>\n<p>A seventh category \u2014 <strong>waste disposal and environmental management<\/strong> (skip hire, recycling, dust and noise control) \u2014 is sometimes itemised separately and sometimes folded into site setup, depending on the contractor. Worth confirming which approach your quote uses.<\/p>\n<p><!-- ========== SECTION 2: HOW MUCH DO PRELIMINARIES COST? ========== --><br \/>\n<!-- NOTE: This section is positioned high in the article deliberately. \"How much do preliminaries cost\" is the highest-value commercial query within this topic cluster and should be answered before the reader has to scroll past 1,000+ words. --><\/p>\n<hr \/>\n<h2>How much do preliminaries cost?<\/h2>\n<p>Preliminaries on UK residential and commercial construction projects typically account for <strong>5\u201315% of total project cost<\/strong>. Where in that range a specific project falls depends on four main factors:<\/p>\n<ul>\n<li><strong>Project size<\/strong> \u2014 smaller jobs carry higher percentages because fixed costs (insurance, supervision, welfare provision) make up a bigger share of the total<\/li>\n<li><strong>Site complexity<\/strong> \u2014 restricted access, conservation areas, listed buildings, and public-facing sites all push preliminaries higher<\/li>\n<li><strong>Project duration<\/strong> \u2014 longer programmes accumulate more weeks of skip hire, security, scaffolding and welfare costs<\/li>\n<li><strong>Location<\/strong> \u2014 urban sites with restricted access and parking often need additional measures (traffic management, road closures, time-restricted deliveries)<\/li>\n<\/ul>\n<h3>Worked examples<\/h3>\n<p>The table below shows what 5%, 10% and 15% preliminaries look like across typical UK project values.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Project value<\/th>\n<th scope=\"col\">Simple site (5%)<\/th>\n<th scope=\"col\">Typical site (10%)<\/th>\n<th scope=\"col\">Complex \/ restricted site (15%)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u00a350,000<\/td>\n<td>\u00a32,500<\/td>\n<td>\u00a35,000<\/td>\n<td>\u00a37,500<\/td>\n<\/tr>\n<tr>\n<td>\u00a3100,000<\/td>\n<td>\u00a35,000<\/td>\n<td>\u00a310,000<\/td>\n<td>\u00a315,000<\/td>\n<\/tr>\n<tr>\n<td>\u00a3250,000<\/td>\n<td>\u00a312,500<\/td>\n<td>\u00a325,000<\/td>\n<td>\u00a337,500<\/td>\n<\/tr>\n<tr>\n<td>\u00a3500,000<\/td>\n<td>\u00a325,000<\/td>\n<td>\u00a350,000<\/td>\n<td>\u00a375,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These figures cover the preliminary items themselves. They&#8217;re separate from the <strong>contingency<\/strong> you should hold for unforeseen issues during the build (typically a further 10\u201315% of project cost).<\/p>\n<h3>Where preliminaries sit in the overall budget<\/h3>\n<p>Preliminaries are one of five main cost categories on most construction projects. The table below shows typical proportions for UK residential work.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Cost category<\/th>\n<th scope=\"col\">Typical share of total budget<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Preliminaries<\/td>\n<td>5\u201315%<\/td>\n<\/tr>\n<tr>\n<td>Labour and subcontractors<\/td>\n<td>30\u201340%<\/td>\n<\/tr>\n<tr>\n<td>Materials<\/td>\n<td>30\u201340%<\/td>\n<\/tr>\n<tr>\n<td>Professional fees (architect, engineer, surveys)<\/td>\n<td>5\u201310%<\/td>\n<\/tr>\n<tr>\n<td>Contingency<\/td>\n<td>5\u201310%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The percentages are indicative and shift by project type. Heritage and listed building work tends to push preliminaries and professional fees higher; volume new-build sees lower preliminaries due to economies of scale. <em>(Source: BCIS benchmarking data and NRM2 measurement standards.)<\/em><\/p>\n<hr \/>\n<p><!-- ========== SECTION 3: WHY PRELIMINARIES MATTER ========== --><\/p>\n<h2>Why preliminaries matter (and why they&#8217;re often missed)<\/h2>\n<p>Three reasons preliminaries deserve serious attention from clients:<\/p>\n<h3>Cost transparency<\/h3>\n<p>When preliminaries are bundled into a single lump sum on a quote, you can&#8217;t see what you&#8217;re paying for or compare quotes meaningfully. Itemised preliminaries \u2014 fencing, scaffolding, welfare, insurance \u2014 let you spot underpricing, identify omissions, and challenge anything that looks off. A reputable contractor should present them as line items, not bury them in a headline figure. We&#8217;ve covered this distinction in more depth in our guide to <a href=\"\/quality-builder-versus-budget-builder\/\">quality builders versus budget builders<\/a>.<\/p>\n<h3>Risk and compliance<\/h3>\n<p>Many preliminaries \u2014 particularly health and safety provisions and insurance \u2014 exist because they&#8217;re legally required, not because the contractor wants to bill for them. Cutting corners on PPE, signage, welfare facilities or HSE-compliant fencing exposes everyone on site to physical risk, and exposes both contractor and client to legal and financial consequences. Under the CDM Regulations 2015, the client carries specific duties on construction projects. These aren&#8217;t optional.<\/p>\n<h3>Project flow<\/h3>\n<p>Most expensive delays on construction sites trace back to weak preliminaries. Trades can&#8217;t start because access isn&#8217;t ready. Materials can&#8217;t be delivered because the site isn&#8217;t set up. Inspections fail because permits weren&#8217;t filed. Strong preliminaries pay for themselves by preventing the downtime that small contractors charge for and large contractors absorb into next month&#8217;s invoice \u2014 either way, the client pays.<\/p>\n<p><!-- ========== SECTION 4: ILLUSTRATIVE EXAMPLE ========== --><br \/>\n<!-- NOTE: Clearly labelled as illustrative \u2014 not a real project. Per client direction. Worth styling visually distinct (e.g. light background, indented) so the reader understands it's a worked example, not a case study. --><\/p>\n<h2>Illustrative example<\/h2>\n<p><em>The following scenario is illustrative \u2014 not a specific project \u2014 but reflects realistic figures for the type of work and location described.<\/em><\/p>\n<p>A homeowner planning a <strong>\u00a3120,000 kitchen extension<\/strong> in central Oxford finds that preliminaries for their project come to <strong>\u00a314,000<\/strong>, towards the higher end of the typical range. The drivers:<\/p>\n<ul>\n<li>The site sits next to a busy pedestrian walkway, requiring full hoarding rather than standard fencing<\/li>\n<li>The access road needs a partial closure permit for skip and material deliveries<\/li>\n<li>The property is in a conservation area, triggering additional planning conditions and surveys<\/li>\n<li>Site welfare for a four-month programme runs to several thousand pounds across portable toilets, washing facilities and a small welfare cabin<\/li>\n<\/ul>\n<p>Itemising these costs at quote stage means the homeowner budgets \u00a314,000 alongside the \u00a3106,000 for materials, labour and finishes \u2014 plus a separate 10% contingency. Without that breakdown, the same homeowner might have signed a \u00a3120,000 lump-sum contract assuming everything was included, then found themselves \u00a314,000 short at first-fix.<\/p>\n<hr \/>\n<p><!-- ========== SECTION 5: HOW TO MANAGE PRELIMINARIES ========== --><\/p>\n<h2>How to manage preliminaries (for clients)<\/h2>\n<p>Six practical points for keeping preliminaries under control:<\/p>\n<ol>\n<li><strong>Always request itemised quotes.<\/strong> Lump-sum preliminaries hide both genuine costs and missing scope. If a contractor won&#8217;t break them down, that&#8217;s information about the contractor.<\/li>\n<li><strong>Plan permit applications early.<\/strong> Planning permission can take 8 weeks; some council permits longer. Submitting late means waiting at the start of your programme rather than during it.<\/li>\n<li><strong>Hold a 5\u201310% contingency on top of the preliminaries budget.<\/strong> Site conditions surprise. Programmes extend. Permits get rejected and resubmitted. A contingency separate from the main project contingency gives you flexibility.<\/li>\n<li><strong>Confirm in writing who&#8217;s responsible for what.<\/strong> If you&#8217;re supplying any preliminary items yourself \u2014 PPE, welfare, skip hire \u2014 document it. Assumptions cause disputes.<\/li>\n<li><strong>Document scope changes immediately.<\/strong> Any change to the project \u2014 adding a room, relocating an extension \u2014 may push preliminaries up. Capture the cost impact at the point of change, not at the end of the job.<\/li>\n<li><strong>Review preliminary spend at site meetings.<\/strong> If skip hire was budgeted for six weeks and you&#8217;re at week eight, somebody needs to flag it. Regular reviews prevent end-of-project shocks.<\/li>\n<\/ol>\n<p>For a comprehensive checklist covering preliminaries and the broader planning process, see our <a href=\"\/free-construction-planning-checklist\/\">free construction planning checklist<\/a>.<\/p>\n<hr \/>\n<p><!-- ========== SECTION 6: FAQs (with FAQ schema \u2014 see bottom of file) ========== --><\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>How much do preliminaries cost on a UK construction project?<\/h3>\n<p>Preliminaries typically account for 5\u201315% of total project cost on UK residential and commercial work. On a \u00a3100,000 project that&#8217;s \u00a35,000\u2013\u00a315,000; on a \u00a3500,000 project, \u00a325,000\u2013\u00a375,000. Smaller, complex, or restricted sites sit at the higher end; larger or simpler sites at the lower end.<\/p>\n<h3>What&#8217;s the difference between preliminaries and contingency?<\/h3>\n<p>Preliminaries are known costs for project enablement \u2014 site setup, insurance, welfare, project management \u2014 that you budget for upfront. Contingency is a separate fund (usually 10\u201315% of project cost) held back to cover genuinely unforeseen issues during the build. They serve different purposes and shouldn&#8217;t be conflated. Both are needed.<\/p>\n<h3>Why are preliminaries sometimes not shown separately on a quote?<\/h3>\n<p>Some contractors bundle preliminaries into their headline price for simplicity. While this can produce a cleaner-looking quote, it makes meaningful comparison between contractors much harder and obscures whether items have been missed. Always request an itemised breakdown.<\/p>\n<h3>Can I supply some preliminary items myself to save money?<\/h3>\n<p>Sometimes \u2014 for example, if you have a long-term skip hire arrangement or can supply PPE through another business. Discuss this with your contractor at quote stage so responsibilities are clear in the contract. Don&#8217;t assume you can supply items unilaterally; some preliminaries (HSE-compliant signage, certified scaffolding) need to meet specific standards the contractor is responsible for.<\/p>\n<h3>Do preliminaries change if the project scope changes mid-build?<\/h3>\n<p>Yes. Adding rooms, relocating elements, or changing materials can affect site setup, programme length, additional surveys, and insurance cover. A well-drafted contract sets out a variations procedure that captures these cost impacts in writing as changes are agreed \u2014 not at the end of the project.<\/p>\n<h3>Are preliminaries the same on every project?<\/h3>\n<p>No. They vary substantially based on site complexity, location, project duration and project type. A new build on an open rural plot will have different preliminaries to a renovation in a city centre conservation area. The 5\u201315% range is indicative; expect your specific project to sit somewhere within it based on its conditions.<\/p>\n<hr \/>\n<p><!-- ========== SECTION 7: ABOUT THE AUTHOR + SOFT CTA ========== --><\/p>\n<div class=\"author-box\">\n<h2>About the author<\/h2>\n<p><strong>Henry Lynch<\/strong> is Managing Director of Lynch Brother Homes, which he set up with John Lynch in 2018. The Lynch family has built in Oxfordshire since 1984. From apprentice carpenter to overseeing more than 500 building projects across the county, Henry was named Oxfordshire Young Business Person of the Year in 2025. He writes about construction, planning and building practice for homeowners and clients.<\/p>\n<p><a href=\"\/henry-lynch-bio\/\">Read Henry&#8217;s full bio<\/a> \u00a0\u00b7\u00a0 <a href=\"\/contact\/\">Based in Oxford? Get in touch.<\/a><\/p>\n<\/div>\n<p><!--\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Article\",\n  \"headline\": \"What Are Preliminaries in Construction? Costs & Examples (UK Guide)\",\n  \"description\": \"Preliminaries are the indirect costs that enable a UK construction project to run \u2014 typically 5\u201315% of total budget. A clear breakdown with worked examples.\",\n  \"image\": \"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/PATH-TO-FEATURED-IMAGE.jpg\",\n  \"datePublished\": \"2024-01-01\",\n  \"dateModified\": \"2026-04-27\",\n  \"author\": {\n    \"@type\": \"Person\",\n    \"name\": \"Henry Lynch\",\n    \"url\": \"https:\/\/lynchbrotherhomes.co.uk\/henry-lynch-bio\/\",\n    \"jobTitle\": \"Managing Director\",\n    \"worksFor\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Lynch Brother Homes\",\n      \"url\": \"https:\/\/lynchbrotherhomes.co.uk\/\"\n    }\n  },\n  \"publisher\": {\n    \"@type\": \"Organization\",\n    \"name\": \"Lynch Brother Homes\",\n    \"url\": \"https:\/\/lynchbrotherhomes.co.uk\/\",\n    \"logo\": {\n      \"@type\": \"ImageObject\",\n      \"url\": \"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/PATH-TO-LOGO.png\"\n    }\n  },\n  \"mainEntityOfPage\": {\n    \"@type\": \"WebPage\",\n    \"@id\": \"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/\"\n  }\n}\n<\/script>\n\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How much do preliminaries cost on a UK construction project?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Preliminaries typically account for 5\u201315% of total project cost on UK residential and commercial work. On a \u00a3100,000 project that's \u00a35,000\u2013\u00a315,000; on a \u00a3500,000 project, \u00a325,000\u2013\u00a375,000. Smaller, complex, or restricted sites sit at the higher end; larger or simpler sites at the lower end.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What's the difference between preliminaries and contingency?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Preliminaries are known costs for project enablement \u2014 site setup, insurance, welfare, project management \u2014 that you budget for upfront. Contingency is a separate fund (usually 10\u201315% of project cost) held back to cover genuinely unforeseen issues during the build. They serve different purposes and shouldn't be conflated. Both are needed.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Why are preliminaries sometimes not shown separately on a quote?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Some contractors bundle preliminaries into their headline price for simplicity. While this can produce a cleaner-looking quote, it makes meaningful comparison between contractors much harder and obscures whether items have been missed. Always request an itemised breakdown.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Can I supply some preliminary items myself to save money?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Sometimes \u2014 for example, if you have a long-term skip hire arrangement or can supply PPE through another business. Discuss this with your contractor at quote stage so responsibilities are clear in the contract. Don't assume you can supply items unilaterally; some preliminaries (HSE-compliant signage, certified scaffolding) need to meet specific standards the contractor is responsible for.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Do preliminaries change if the project scope changes mid-build?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Yes. Adding rooms, relocating elements, or changing materials can affect site setup, programme length, additional surveys, and insurance cover. A well-drafted contract sets out a variations procedure that captures these cost impacts in writing as changes are agreed \u2014 not at the end of the project.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Are preliminaries the same on every project?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"No. They vary substantially based on site complexity, location, project duration and project type. A new build on an open rural plot will have different preliminaries to a renovation in a city centre conservation area. The 5\u201315% range is indicative; expect your specific project to sit somewhere within it based on its conditions.\"\n      }\n    }\n  ]\n}\n<\/script>\n--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What Are Preliminaries in Construction? Costs &amp; Examples (UK Guide) Preliminaries are the indirect costs in [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2021,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5,8],"tags":[],"class_list":["post-2017","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-domestic","category-expert-advice"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What Are Preliminaries in Construction? Lynch Brother Homes<\/title>\n<meta name=\"description\" content=\"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Are Preliminaries in Construction? Lynch Brother Homes\" \/>\n<meta property=\"og:description\" content=\"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/\" \/>\n<meta property=\"og:site_name\" content=\"Lynch Brother Homes\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Lynch-Brother-Homes-107790480683912\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-17T12:58:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-21T10:29:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Henry Lynch\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@lynchhomes\" \/>\n<meta name=\"twitter:site\" content=\"@lynchhomes\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Henry Lynch\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/\"},\"author\":{\"name\":\"Henry Lynch\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#\\\/schema\\\/person\\\/659e16c872add0a1dc9016c5cc439cc8\"},\"headline\":\"What Are Preliminaries?\",\"datePublished\":\"2025-01-17T12:58:49+00:00\",\"dateModified\":\"2026-09-21T10:29:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/\"},\"wordCount\":1625,\"publisher\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Building-Contractor-in-Oxfordshire-scaled.jpg\",\"articleSection\":[\"Domestic\",\"expert advice\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/\",\"name\":\"What Are Preliminaries in Construction? Lynch Brother Homes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Building-Contractor-in-Oxfordshire-scaled.jpg\",\"datePublished\":\"2025-01-17T12:58:49+00:00\",\"dateModified\":\"2026-09-21T10:29:14+00:00\",\"description\":\"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#primaryimage\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Building-Contractor-in-Oxfordshire-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/Building-Contractor-in-Oxfordshire-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Building Contractor in Oxfordshire\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/what-are-preliminaries\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Are Preliminaries?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#website\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/\",\"name\":\"Lynch Brother Homes\",\"description\":\"Builders in Oxford Since 1984\",\"publisher\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#organization\",\"name\":\"Lynch Brother Homes\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/favicon.png\",\"width\":127,\"height\":127,\"caption\":\"Lynch Brother Homes\"},\"image\":{\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Lynch-Brother-Homes-107790480683912\\\/\",\"https:\\\/\\\/x.com\\\/lynchhomes\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCcaLkGhgDoSoiaw--1Z-eEg\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/lynch-brother-homes?originalSubdomain=uk\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/#\\\/schema\\\/person\\\/659e16c872add0a1dc9016c5cc439cc8\",\"name\":\"Henry Lynch\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/Lynch-Brother-Homes-2-Copy-96x96.png\",\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/Lynch-Brother-Homes-2-Copy-96x96.png\",\"contentUrl\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/Lynch-Brother-Homes-2-Copy-96x96.png\",\"caption\":\"Henry Lynch\"},\"url\":\"https:\\\/\\\/lynchbrotherhomes.co.uk\\\/author\\\/henry\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Are Preliminaries in Construction? Lynch Brother Homes","description":"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/","og_locale":"en_GB","og_type":"article","og_title":"What Are Preliminaries in Construction? Lynch Brother Homes","og_description":"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.","og_url":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/","og_site_name":"Lynch Brother Homes","article_publisher":"https:\/\/www.facebook.com\/Lynch-Brother-Homes-107790480683912\/","article_published_time":"2025-01-17T12:58:49+00:00","article_modified_time":"2026-09-21T10:29:14+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg","type":"image\/jpeg"}],"author":"Henry Lynch","twitter_card":"summary_large_image","twitter_creator":"@lynchhomes","twitter_site":"@lynchhomes","twitter_misc":{"Written by":"Henry Lynch","Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#article","isPartOf":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/"},"author":{"name":"Henry Lynch","@id":"https:\/\/lynchbrotherhomes.co.uk\/#\/schema\/person\/659e16c872add0a1dc9016c5cc439cc8"},"headline":"What Are Preliminaries?","datePublished":"2025-01-17T12:58:49+00:00","dateModified":"2026-09-21T10:29:14+00:00","mainEntityOfPage":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/"},"wordCount":1625,"publisher":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/#organization"},"image":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#primaryimage"},"thumbnailUrl":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg","articleSection":["Domestic","expert advice"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/","url":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/","name":"What Are Preliminaries in Construction? Lynch Brother Homes","isPartOf":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#primaryimage"},"image":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#primaryimage"},"thumbnailUrl":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg","datePublished":"2025-01-17T12:58:49+00:00","dateModified":"2026-09-21T10:29:14+00:00","description":"Preliminaries are the indirect costs that enable a UK construction project \u2014 typically 5\u201315% of budget. View our Guide here to learn more.","breadcrumb":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#primaryimage","url":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg","contentUrl":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2025\/01\/Building-Contractor-in-Oxfordshire-scaled.jpg","width":2560,"height":1707,"caption":"Building Contractor in Oxfordshire"},{"@type":"BreadcrumbList","@id":"https:\/\/lynchbrotherhomes.co.uk\/what-are-preliminaries\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lynchbrotherhomes.co.uk\/"},{"@type":"ListItem","position":2,"name":"What Are Preliminaries?"}]},{"@type":"WebSite","@id":"https:\/\/lynchbrotherhomes.co.uk\/#website","url":"https:\/\/lynchbrotherhomes.co.uk\/","name":"Lynch Brother Homes","description":"Builders in Oxford Since 1984","publisher":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lynchbrotherhomes.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/lynchbrotherhomes.co.uk\/#organization","name":"Lynch Brother Homes","url":"https:\/\/lynchbrotherhomes.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lynchbrotherhomes.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2020\/11\/favicon.png","contentUrl":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2020\/11\/favicon.png","width":127,"height":127,"caption":"Lynch Brother Homes"},"image":{"@id":"https:\/\/lynchbrotherhomes.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Lynch-Brother-Homes-107790480683912\/","https:\/\/x.com\/lynchhomes","https:\/\/www.youtube.com\/channel\/UCcaLkGhgDoSoiaw--1Z-eEg","https:\/\/www.linkedin.com\/company\/lynch-brother-homes?originalSubdomain=uk"]},{"@type":"Person","@id":"https:\/\/lynchbrotherhomes.co.uk\/#\/schema\/person\/659e16c872add0a1dc9016c5cc439cc8","name":"Henry Lynch","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2020\/12\/Lynch-Brother-Homes-2-Copy-96x96.png","url":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2020\/12\/Lynch-Brother-Homes-2-Copy-96x96.png","contentUrl":"https:\/\/lynchbrotherhomes.co.uk\/wp-content\/uploads\/2020\/12\/Lynch-Brother-Homes-2-Copy-96x96.png","caption":"Henry Lynch"},"url":"https:\/\/lynchbrotherhomes.co.uk\/author\/henry\/"}]}},"_links":{"self":[{"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/posts\/2017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/comments?post=2017"}],"version-history":[{"count":8,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/posts\/2017\/revisions"}],"predecessor-version":[{"id":3038,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/posts\/2017\/revisions\/3038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/media\/2021"}],"wp:attachment":[{"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/media?parent=2017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/categories?post=2017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lynchbrotherhomes.co.uk\/api\/wp\/v2\/tags?post=2017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}